Company Profile

Advanced Technologies Inc
Profile last edited on: 12/29/2016      CAGE: 3ELP6      UEI: SZBTN58MBTB1

Business Identifier: Open Source Traffic Signal Control Software
Year Founded
1986
First Award
1992
Latest Award
2013
Program Status
Inactive
Popularity Index
Is this YOUR Company?
Ensure accuracy and completeness of YOUR Company Profile by completing the brief Survey Instrument attached
Do you know about this Awardees?
Let us encourage you to provide any data which would enhance the completeness of this firm's profile.

Location Information

5703 Red Bug Lake Road Unit 320
Winter Springs, FL 32708
Location: Single
Congr. District: 07
County: Seminole

Public Profile

With a track record of successful projects over several decades, principals of the firm are now moved on, one now with a Major Prime which had previously been a ocllaborator. Advanced Technologies had developed an open source dual redundant traffic signal control environment, called the Signal Control Program Environment. This program, abbreviated as SCOPE, both pretimed and actuated control modes. In actuated mode, had min recall, max recall, gap out, max gap, and presence modes that include NCHRP 3-66 Signal Transition Logic concepts. SCOPE interfaced with both NEMA-TS2 and Intelligent Transportation Systems (ITS) traffic cabinets. SCOPE had been run on four different hardware platforms; a PC (used for concept and unit testing), a PowerPC prototype board with various I/O connectors (used for integration testing), a $35 Raspberry PI SOM, and an Advanced Traffic Controller (currently, a PEEK ATC-1000). SCOPE also has been integrated with the open source TEXAS traffic control simulator. All software requirement, design, implementation, testing, configuration management and documentation tools used to develop SCOPE are open source and free.

Extent of SBIR involvement

User Avatar

Synopsis: Awardee Business Condition

Employee Range
1-4
Revenue Range
Less than .5M
VC funded?
No
Public/Private
Privately Held
Stock Info
----
IP Holdings
1-4

Awards Distribution by Agency

Most Recent SBIR Projects

Year Phase Agency Total Amount
2013 2 DOT $924,472
Project Title: Signal State Transition Software Development
1992 1 NASA $49,990
Project Title: Icon code environment

Key People / Management

  Donna Romanowich -- CEO, and Lead System's Engineer:

Company News

There are no news available.