SBIR-STTR Award

Portable computer-based system for creation of as-built drawings
Award last edited on: 3/20/2002

Sponsored Program
SBIR
Awarding Agency
NSF
Total Award Amount
$49,902
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
William R Murray

Company Information

Resources Engineering Systems Inc

One Cambridge Center
Cambridge, MA 02142
   (617) 621-8555
   evin@resnet.com
   www.resnet.com
Location: Single
Congr. District: 07
County: Middlesex

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
1987
Phase I Amount
$49,902
It is proposed to establish proof of concept (in Phase I) and develop (in Phase 11) a cost-effective portable computer-based system for acquisition and processing of data needed to create, on-site if desired, as-built drawings of facilities such as buildings and space layouts. Robust algorithms for checking the measurements given and user interface graphics will give the needed reliability for eventual commercial application. The core of the system will be based on a highperformance 32-bit single-board computer readily available. The computer will be supplemented with convenient commercially-available transducers for measurement of distances, orientations and specific reference locations. Various options exist for these sensors: a number of particular approaches are discussed, such as an ultrasonic transmitter-receiver, theodolite-type systems with direct electronic readout of angles and distance, and laser-based systems. An overall system with reliable data acquisition from sensors, real-time processing, analysis and graphical display of the physical locations, will be designed to the prototype level in Phase I and implemented in Phase 11.Anticipated Results and

Potential Commercial Applications:
The practical impact of such a system would be enormous. Most engineering, building contracting, and architectural offices would be likely to obtain such a system if the price is reasonable; making the system cost-effective will be a major concern throughout the project.