SBIR-STTR Award

ArcSpear Electric Jet Drone Inspection Platform
Award last edited on: 4/28/2024

Sponsored Program
SBIR
Awarding Agency
DOD : Navy
Total Award Amount
$102,910
Award Phase
1
Solicitation Topic Code
N231-071
Principal Investigator
Pete Bitar

Company Information

Airbuoyant LLC

1735 West 53rd Street
Anderson, IN 46013
   (765) 623-9815
   info@airbuoyant.com
   www.airbuoyant.com
Location: Single
Congr. District: 05
County: Madison

Phase I

Contract Number: 2023
Start Date: ----    Completed: 7/17/2023
Phase I year
2023
Phase I Amount
$102,910
The ArcSpear Jet Drone is a compact, high-thrust, electric jet powered VTOL drone that can fly at very high speeds and carry heavy payloads within a very small footprint, configurable to customer needs. ArcSpear can be outfitted to meet the objectives of the mission sets described in this topic. The key differentiators of the ArcSpear are that it has no exposed rotor blades and yet still produces high thrust with standard quadcopter stability and ease of use. The ArcSpear can fit is small spaces and even bounce off of obstacles without being damaged, and can trade its high payload capacity for additional batteries, allowing it to perform higher-endurance missions. It is a tool in the toolkit, and can be used for a variety of taskings, outside of the mission parameters of this SBIR Topic, so that it has versatility and is not pigeon-holed into only one role.

Benefit:
ArcSpear is already being ordered for use in Ukraine as a reusable, anti-armor/anti-artillery system and has the capability of doing everything from rapid drone delivery service, to medical supply delivery, to high-speed filmography and first responder applications for police, fire and rescue. ArcSpear is easily configurable to match the payload requirements of any customer, without great expense, so that it always fits the task at hand.

Keywords:
Jet Drone, Jet Drone, multicopter, high-speed, Rotorless, ArcSpear, Durable, Quadcopter, Electric Jet

Phase II

Contract Number: N68335-23-C-0471
Start Date: 1/16/2024    Completed: 00/00/00
Phase II year
----
Phase II Amount
----