SBIR-STTR Award

Aircraft High-Power Semiconductor Line Contactors
Award last edited on: 2/19/2007

Sponsored Program
SBIR
Awarding Agency
DOD : Navy
Total Award Amount
$149,974
Award Phase
1
Solicitation Topic Code
N05-015
Principal Investigator
Martin F Karchnak

Company Information

Epoch Engineering Inc (AKA: EEI)

806 West Diamond Avenue Suite 105
Gaithersburg, MD 20876
   (561) 670-6600
   t-enterprises@te-inc.com
   www.epochengineering.com
Location: Multiple
Congr. District: 06
County: Montgomery

Phase I

Contract Number: N68335-05-C-0219
Start Date: 4/27/2005    Completed: 10/27/2005
Phase I year
2005
Phase I Amount
$149,974
Power distribution in legacy systems, including aircraft, has been implemented employing electro-mechanical switching. Advances in technology that enable use of flightworthy, high power, solid state switch technology to replace electro-mechanical power line contactors are available. This development is focused upon an innovative replacement that not only is `form, fit and functionally' acceptable, but that also provides meaningful improvements in critical areas such as switching time, reliability and fault measurement. `Millisecond' switching times provide an example of changing (i.e. more demanding) requirements; increased mean time between failures (MTBFs) and an improved fault assessment capability provide examples of changes that are operationally and programatically desirable. In particular, this effort establishes the feasibility of a recommended design for an aircraft high power distribution system that would enable the introduction of quick, reliable, lightweight semiconductor power line contactors capable of delivering three-phase, 115 volt, 260 amp electrical power with the ability to transfer power between the main busses within milliseconds while simultaneously detecting power source failure. Detailed development and demonstration plans for the selected aircraft high power semiconductor power distribution system are also provided

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----