SBIR-STTR Award

Airspace Simulation Through Indoor Operation of Subscale Flight Vehicles
Award last edited on: 1/13/2015

Sponsored Program
SBIR
Awarding Agency
NASA : ARC
Total Award Amount
$99,250
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
Peter Gage

Company Information

Neerim Corporation

2551 Casey Avenue Suite B
Mountain View, CA 94043
   (650) 269-9328
   info@neerimcorp.com
   www.neerimcorp.com
Location: Single
Congr. District: 18
County: Santa Clara

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2011
Phase I Amount
$99,250
An indoor environment for simulating airspace operations will be designed. Highly maneuverable subscale vehicles can be used to simulate the dynamics of full-scale vehicles by applying software limiters on their rates. Multiple vehicles can operate autonomously or can be coordinated through centralized control. The effects of weather on system throughput can be assessed by monitoring movements in the controlled environment, Faults related to communication, detection and vehicle performance can be inserted into the system, to assess the robustness of proposed airspace concepts. We are particularly interested in the impact of UAVs in the NAS. Automated separation assurance schemes are essential for UAV integration. The indoor environment is ideally suited to prove out both airborne and ground-based approaches to separation assurance. Beyond this particular motivation for developing this test facility, evaluation of novel algorithms for trajectory design and innovative communication concepts can be assessed safely and cost-effectively in this environment. The key innovation is the environment in which vehicles and airspace technologies can be assessed. We are not proposing innovation in the technologies themselves. Furthermore, we think that the key elements of the environment are already available, but they have not been assembled into a system that supports airspace simulation. The innovation is primarily system integration, with some customization of the various elements so that interaction between elements is representative of full-scale airspace operations.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----