SBIR-STTR Award

ESPA for Lunar and Science Missions
Award last edited on: 1/13/2021

Sponsored Program
SBIR
Awarding Agency
NASA : ARC
Total Award Amount
$99,985
Award Phase
1
Solicitation Topic Code
S4.02
Principal Investigator
Joseph R Maly

Company Information

CSA Engineering Inc (AKA: MOOG Inc)

2565 Leghorn Street
Mountain View, CA 94043
   (650) 210-9000
   N/A
   www.csaengineering.com
Location: Multiple
Congr. District: 18
County: Santa Clara

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2008
Phase I Amount
$99,985
NASA mission planning in the next decade includes small spacecraft and secondary flight opportunities on Evolved Expendable Launch Vehicles (EELVs), specifically Atlas V and Delta IV. NASA's use of EELVs is accelerated because of the impending termination of the Delta II launcher. Nearly all EELVs slated for launch have significant excess payload capacity. The EELV Secondary Payload Adapter (ESPA) Ring was developed by CSA Engineering under an Air Force SBIR to utilize excess lift capability by providing a secondary mission capability. ESPA, as built, can provide access to space for NASA lunar and science missions. However, to ensure that diverse NASA mission objectives can be achieved with the best possible mission configurations, structural tailoring of the ESPA will be required. The proposed effort will develop modular features of ESPA that are required for optimal NASA mission configurations targeting, but not necessarily limited to, the following: (1) Separable ESPA: Separation capability built into the ESPA Ring. (2) Hierarchical ESPA: Scaling of the ESPA design for larger EELV payloads and for small launch vehicles. (3) ESPA Mounts: Interior and exterior mounting for spacecraft and auxiliary structures. Phase 1 will establish feasibility for the modular ESPA designs. Plans will be presented for flight qualification of all designs. Phase 2 will produce flight qualified hardware to at least TRL 6 for a design determined to be the most desirable for near-term NASA implementation.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----