SBIR-STTR Award

High Energy Replacement for Teflon Propellant in Pulsed Plasma Thrusters
Award last edited on: 12/5/2003

Sponsored Program
SBIR
Awarding Agency
NASA
Total Award Amount
$70,000
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
Charles Grix

Company Information

ET Materials LLC (AKA: Ecotech)

3239 Monier Circle Suite4
Rancho Cordova, CA 95742
   (916) 631-6310
   N/A
   N/A
Location: Single
Congr. District: 07
County: Sacramento

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2004
Phase I Amount
$70,000
This program will utilize a well-characterized Pulsed Plasma Thruster (PPT) to test experimental high-energy extinguishable solid propellants (HE), instead of standard Teflon propellant. ET Materials LLC originally formulated this material as an environmentally friendly automotive airbag inflator propellant. In preliminary testing, the material was found suitable for use in PPTs. Electric arc discharges of the PPT apparently causes only thin surface layers of the energetic propellant to be ignited, without uncontrolled propagation to underlying propellant. The current Isp of these propellants is ~225 sec. but newer formulations appear to be reaching an Isp of 245 sec., essentially that of ammonium perchlorate propellants. The relative thrust contribution from plasma ionization and thermal expansion of non-ionized combustion gases will determine how much the energetic fuel enhances PPT performance. All testing and evaluation of the HE propellant will be conducted using the Aerojet Modular Test Unit Pulsed Plasma Thruster. This modular test unit was specifically designed to evaluate new flight configurations of the EO-1 PPT design. Using the high-energy propellant in the EO-1 PPT, should increase dramatically increase. This program will provide NASA with directly applicable results for a high-energy drop-in alternative propellant for the EO-1 PPT, providing new mission capabilities.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----