SBIR-STTR Award

Improved Manufacturing Processes For EKV Telescopes by Application of DFMA and Advanced Metrology Tools
Award last edited on: 2/21/2007

Sponsored Program
SBIR
Awarding Agency
DOD : MDA
Total Award Amount
$99,324
Award Phase
1
Solicitation Topic Code
MDA04-111
Principal Investigator
Michael James

Company Information

Zygo Corporation

Laurel Brook Road
Middlefield, CT 06455
   (860) 347-8506
   ddressler@zygo.com
   www.zygo.com
Location: Single
Congr. District: 03
County: Middlesex

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2005
Phase I Amount
$99,324
There is significant opportunity to reduce cost, cycle time, and process variability of optical sensor assemblies through the application of innovative engineering and metrology tools. The objective of this proposal is to demonstrate the feasibility of applying DFMA (Design for Manufacturability and Assembly) techniques and Advanced Metrology tools to systematically evaluate the manufacturing processes associated with construction of EKV telescopes, and to relate this information to improvements in cost, cycle time, reliability, quality/yield and manufacturing process variability. The metrics for making a true assessment are interrelated in a complex manner that includes the design/system performance requirements, component design and fabrication methods, assembly and alignment methods and procedures, test requirements, and the special tooling and test equipment used to accomplish the tasks at each level. Raytheon Missile Systems in Tucson, Arizona will work together with Zygo as an integrated product improvement (IPT) team to model different candidate designs and feed the DFMA information back into the design cycle. By doing this in an iterative manner, each configuration can be evaluated uniformly with each candidate design having the benefits of the DFMA process. Zygo has a successful track record of achieving reduced cost and cycle time and improved yield from distributed resources through the use of the DFMA process

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----