SBIR-STTR Award

Development of a Self-Contained Electrocoagulation Device to Achieve Stormwater Water Quality Goals
Award last edited on: 8/17/2023

Sponsored Program
SBIR
Awarding Agency
DOT
Total Award Amount
$150,000
Award Phase
1
Solicitation Topic Code
23-FH1
Principal Investigator
Barry Fagan

Company Information

Fagan Consulting LLC

787 Glennbrooke Boulevard
Prattville, AL 36066
   (334) 850-5721
   N/A
   www.faganllc.com
Location: Single
Congr. District: 02
County: Autauga

Phase I

Contract Number: 6913G623P800061
Start Date: 7/20/2023    Completed: 1/19/2024
Phase I year
2023
Phase I Amount
$150,000
The construction, operation, and maintenance of roadways generates pollutants such as sediment, heavy metals, and nutrients; pollutants which the U.S. Environmental Protection Agency (USEPA) identify as the most widespread in impeding the beneficial uses of the Nation’s rivers and streams.DOTs primarily rely on passive stormwater best management practices (BMPs) or stormwater control measures (SCMs) to manage stormwater runoff quality and quantity.However, current BMPs and SCMs are often not capable of completely removing pollutants from stormwater runoff, especially fine-sized soil particles and dissolved pollutants.Fagan Consulting, LLC, in partnership with Auburn University, seeks to develop and commercialize a portable self-contained electrocoagulation unit that could be easily retrofit into existing stormwater infrastructure (e.g., pipes, culverts, detention basins, etc.) to enhance water quality treatment.This Phase I project will (1) develop a market plan for implementation and commercialization, and (2) design, develop, demonstrate, and evaluate a working prototype.Phase I tasks include a literature review, market analysis, design of the electrocoagulation-based treatment system, development of a bench-scale prototype and testing, and the design of a full-scale prototype.This project will develop several outcomes that will pave the way towards ultimately developing a commercial device to treat stormwater runoff.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----