SBIR-STTR Award

Carbon Fiber Thermoplastics with High Through Thickness Modulus
Award last edited on: 8/15/2021

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$111,493
Award Phase
1
Solicitation Topic Code
A19-107
Principal Investigator
Amin Eshghi

Company Information

Trimer Technologies LLC (AKA: Trimer LLC)

45800 Mast Street
Plymouth, MI 48170
   (734) 263-2686
   info@trimer-tech.com
   www.trimer-tech.com
Location: Single
Congr. District: 06
County: Wayne

Phase I

Contract Number: W15QKN-20-P-0046
Start Date: 10/25/2019    Completed: 12/19/2020
Phase I year
2020
Phase I Amount
$111,493
While composite materials have become ubiquitous in aerospace structures over the past decade, their out-of-plane properties are highly dependent on the polymer matrix which for applications such as the reinforcement of gun barrels can lead to through thickness compression rather than axial stress applied to the fibers. Trimer Technologies recently identified a unique technology based on graphene applied to the surface of a prepreg which through preliminary testing has been shown to increase the fracture toughness compared to bare prepreg. This material enhancement is achieved using a low-cost approach which is scalable and can be applied directly to the surface of existing PEEK prepregs. The research proposed will study the graphene formation, demonstrate roll-to-roll manufacturing and optimize the graphene structure to maximize the strength and toughness of fiber reinforced composites. The proposed approach offers a novel, scalable and low-cost method to increase the toughness of composite materials with thermally stable and high strength graphene. Moreover, the superior electrical and thermal properties of graphene may be leveraged to reduce manufacturing costs and add multifunctionality. Because composites are being utilized in almost all military systems, the technology proposed here has clear potential to impact a wide range of military applications.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----