SBIR-STTR Award

Epsilon Near Zero Optical Limiter
Award last edited on: 3/17/21

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$99,989
Award Phase
1
Solicitation Topic Code
A18-131
Principal Investigator
Zachery Coppens

Company Information

Aegis Technologies Group Inc (AKA: Aegis Research Corp~The Aegis Technology Group Inc)

410 Jan Davis Drive
Huntsville, AL 35806
   (256) 922-0802
   N/A
   www.aegistg.com
Location: Single
Congr. District: 05
County: Madison

Phase I

Contract Number: W911W6-19-C-0031
Start Date: 00/00/00    Completed: 00/00/00
Phase I year
2019
Phase I Amount
$99,989
Optical sensor protection against laser threats has been a critical part of the Army’s S&T portfolio, especially with the advancement and availability of laser weapon systems. One particularly threatening system is a pulsed laser system using short (nanosecond) pulses with high fluence that could permanently damage the optical sensor. Typically, these treats are mitigated with optical limiter (OL) devices that protect optical sensors from laser induced damage. These devices transmit low intensity input light (in the PASS state) and limit the light transmission when exposed to light above the sensor damage threshold (in BLOCK state). Therefore, solutions for ultrafast, passive optical limiters where protection is activated by the incoming radiation are needed. Epsilon-near-zero (ENZ) materials provide extreme optical nonlinear response, offering a means to create these passive optical limiters. However, no practical designs exist that meet the stringent requirements for sensor protection. In this Phase I effort, we will explore designs that incorporate ENZ/metamaterial structures to create a reflective optical limiter. The ENZ material enables low activation threshold and the reflective protection strategy significantly increases damage threshold when compared to absorptive methods. Success in this effort will pave the way for a new generation of optical limiting devices

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----