SBIR-STTR Award

Rapidly Deployable Lightweight Shelters for Austere Environments
Award last edited on: 6/8/2012

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$98,678
Award Phase
1
Solicitation Topic Code
A11-099
Principal Investigator
Fred Geurts

Company Information

Federal Fabrics-Fibers Inc (AKA: 3F~Federal-Fabrics-Fibers Inc)

45 West Adams Street
Lowell, MA 01851
   (978) 441-3037
   sales@federalfabrics.com
   www.federalfabrics.com
Location: Single
Congr. District: 03
County: Middlesex

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2012
Phase I Amount
$98,678
Federal Fabrics-Fibers Inc. (FFF) produces several sizes and versions of AirBeam supported shelters. These shelters range in size from 15’ to 40’ wide with lengths ranging from 15 to 70 feet. The shelters are designed for rapid setup, high reliability, and relatively long term deployment. Standard designs are for “normal” military specifications including operation temperatures ranging from 40 to 125°F (-40 to 52°C), steady winds of 55 mph, with gusts up to 65 mph, and snow loads of 10 Lb/ft2 (PSF). FFF’s shelters are rapidly deployable using minimal man power, with very fast “Time Under Canopy”. Shelters have been produced with man doors and cargo doors of various sizes. An FFF AirBeam supported shelter, even up to 30’ wide, can easily be set up by only two persons in under 20 minutes, additional time will be necessary to fully secure the system to meet full load capabilities. Shelters to meet the austere environments called out in this proposal request will be exposed to winds of 100 mph, temperatures of -58 to 140°F (-50 to 60°C), and 20 PSF. These conditions are a bit more stringent that those for which FFF’s shelters are typically designed, however, with minor modifications they are not outside FFF’s shelters capabilities. The goal of this Phase one effort will be to expand the design criteria of Federal Fabrics-Fibers Inc. existing AirFrame supported shelters to meet the additional demands imposed by Austere Environments.

Keywords:
Airbeam, Airframe, Shelter, Tent, Insulation, Rapid Deployment

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----