SBIR-STTR Award

Innovative Cost-Effective Lightweight Transparent Armor for Vehicles
Award last edited on: 2/16/2012

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$69,996
Award Phase
1
Solicitation Topic Code
A10-170
Principal Investigator
Jerry S Chung

Company Information

Frontier Performance Polymers Corporation (AKA: FPP)

5 Eastmans Road Suite 1
Parsippany, NJ 07054
   (973) 331-0923
   info@frontierpolymer.com
   www.frontierpolymer.com
Location: Single
Congr. District: 11
County: Morris

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2011
Phase I Amount
$69,996
The objective of this SBIR project is to develop a novel lightweight and cost-effective transparent armor technology for M-ATV combat vehicle to replace current fielded heavy transparent armor to maximize the situational awareness. The technical objectives of this SBIR is to develop the transparent armor that achieves weight saving of more than 50%, thickness reduction, better optical properties, meeting ballistic requirements, cost increase less than three times, and meeting all operational requirements compared to the current fielded transparent armor. During the Phase I and Phase I Option, Frontier will demonstrate the feasibility of the proposed concept and innovation, identify and address the present technical hurdles, perform proof-of-principle validation as well as address the performance-cost, affordability, scalability, environmental suitability, and manufacturability issues. Moreover, the proposed transparent armor technology would be scalable to be used for any size of front or side window. The success in the Phase I effort will provide a solid foundation for the Phase II to conduct extensive performance validations for the proposed novel lightweight and low cost transparent armor technology for combat vehicles.

Keywords:
Transpaernt, Armor, Lightweight, Glass, Vehicle, Material, Polymer, Ballistic

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----