SBIR-STTR Award

Develop New Innovative Driveline Designs and Components for Improved Service Life, Performance and Durability
Award last edited on: 12/29/2008

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$70,000
Award Phase
1
Solicitation Topic Code
A05-231
Principal Investigator
Brian K Bosk

Company Information

WC Bosk Inc

918 North Lincoln Road
Escanaba, MI 49829
   (906) 789-1112
   brian@wcbosk.com
   www.wcbosk.com
Location: Single
Congr. District: 01
County: Delta

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2006
Phase I Amount
$70,000
Design complete drive line protection for the M915(Truck Family). It will come in the form of a proven concept known as, the W.C. Bosk wedge clutch. We will obtain techincal data from the army and OEM on the vehicle. From this information we will determine a mounting area on the problem drive shaft. Also from this data we will be able to, calculate the maximum torque the problem shaft will take before failure occurs. We will then design a wedge clutch that will fit into the designated mounting area. After knowing the failure point and the size of clutch the mounting area will accomodate, we will design a working clutch which can be retrofitted on the vehicle. The clutch will be designed to slip, at a rated torque load just prior to the failure point. After the torque is reduced in the drive line, the clutch will reset itself allowing the vehicle to continue on, rather than being in need of broke drive line repairs or rear end repairs.

Keywords:
DESIGN AND DEVELOP NEW INNOVATIVE DRIVE LINE COMPONETS, DETERMINE THE WEAKEST LINK IN THE DRIVETRAIN, CALCULATE THE MAXIMUM TORQUE OF THE DRIVE LINE, FIND THE BEST MOUNTING AR

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----