SBIR-STTR Award

Real-Time Error Budget Analysis for Unmanned Air Vehicle Systems
Award last edited on: 1/14/2013

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$99,499
Award Phase
1
Solicitation Topic Code
AF103-008
Principal Investigator
Gregory J Glenn

Company Information

Sysense Corporation

1960 East Grand Avenue Suite 1070
El Segundo, CA 90245
   (310) 322-7973
   info@sysense.com
   www.sysense.com
Location: Single
Congr. District: 33
County: Los Angeles

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2011
Phase I Amount
$99,499
SySense, Inc. proposes to adapt fault detection methodologies developed for the Data Acquisition and Error Budget Analysis Tools (DAEBAT) SBIR effort to the integrity management of Unmanned Air Vehicle Systems (UAVS). In Phase I, a set of integrity monitors will be developed to detect measurement faults in individual sensors and when redundant data is available, parity checks will be performed to detect faults between sources. A trade study will be conducted to develop the architecture of a model-based fault detection and isolation filter for a specific UAVS application such as Sense and Avoid. In a Phase II effort, the sensor monitors developed in Phase I will be implemented as Simulink real-time nodes capable of running on flight hardware. In addition, the model-based fault detection filter studied in Phase I will be developed, integrated, and validated through simulation

Benefit:
This software has applications to many safety critical processes such as those in the automotive, aerospace, and automation industries. Integrity monitors could be installed in automobile stability control systems to monitor for defective sensors. Future applications of an automated highway would require such safety features to ensure passenger safety. The applications within the aerospace industry are large and include engine monitoring, navigation systems assurance, and health monitoring for formation flight clusters.

Keywords:
Sensor Fusion, Analytical Redundancy, Error Analysis, Daebat

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----