SBIR-STTR Award

Advanced High Bandwidth, Large Dynamic Range, Large Size, Fast Steering Mirror
Award last edited on: 10/13/2005

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$99,100
Award Phase
1
Solicitation Topic Code
AF00-015
Principal Investigator
Mike Meline

Company Information

Boeing-SVS Inc (AKA: SVS Inc~SVS R&D Systems Inc)

4411 The 25 Way Ne Suite 350
Albuquerque, NM 87109
   (505) 342-4600
   N/A
   www.svsinc.com
Location: Multiple
Congr. District: 01
County: Bernalillo

Phase I

Contract Number: F29601-00-C-0090
Start Date: 5/1/2000    Completed: 5/10/2001
Phase I year
2000
Phase I Amount
$99,100
The primary objective of this SBIR will be to perform the design processes leading to a preliminary design of an Advanced Fast Steering Mirror (AFSM) traceable to ABL and applicable to tracking tests underway at NOP. Trade studies, control simulations, modal analysis, and thermal analysis will be performed to produce an AFSM design which strikes an effective balance of performance drivers and available technology for actuators, flexures, and mirror sensors. The AFSM electronics will support implementations of control algorithms as developed by Mr. Karl Schrader, an SVS employee, in his Master's Thesis Paper titled: "A Modulated White Light Interferometer forSensing Sub-Wavelength Structural Disturbances". Karl will also investigate a new High Resolution Si Position Sensor (HRSPS) developed by The University of New Mexico. Karl has been granted the use of prototype sensors, from UNM, for development and application to this project. Mr. Mike Meline will lead the effort as Program Manager and Principle Investigator. Mike has 20 years of experience with design, fabrication and test of fast steering mirrors, and has published several fundamental papers on beam steering mirror technology. Mike will guide the SVS team through the design trades and technology selections culminating in a Preliminary Design Review (PDR) by the end of Phase I of this effort.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----