SBIR-STTR Award

Portable Microstructure Evaluation Instrument for Fatigue Damage Measurement in Steels and Al Alloys
Award last edited on: 9/8/14

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$100,000
Award Phase
1
Solicitation Topic Code
AF99-286
Principal Investigator
Paul Moran

Company Information

HyperNex Inc

3006 Research Drive
State College, PA 16801
   (814) 235-0606
   info@hypernexinc.com
   www.hypernexinc.com
Location: Single
Congr. District: 15
County: Centre

Phase I

Contract Number: F09650-99-M-1338
Start Date: 5/19/99    Completed: 2/19/00
Phase I year
1999
Phase I Amount
$100,000
HyperNex proposes to develop the technology for a portable instrument to determine fatigue damage and remaining service life for aging metal structures. The technology will be based on a state-of-the-art fatigue damage instrument currently being developed at HyperNex, for Al and Ti alloys. This instrument measurement measures the microstructural dislocation density non-destructively, using a very parallel x-ray beam. While proved for Al and Ti alloys, micro-structural problems make the current techniques useless for martensitic steels. HyperNex proposes to study the fatigue progression in martensitic steels, and to examine the applicability of an intensity analysis. HyperNex will then compare these results with the lattice strain throughout the fatigue life cycle. The program will proceed as follows: The martensitic steel samples will undergo loading. Surface and subsurface dislocation density and lattice strain will be measured. Results from the two measurements will be tracked against the fatigue life cycle. Validation of the life span map will be accomplished by interrupting high cycle fatigue tests, predicting remaining life, and subsequently cycling the samples to failure. Finally, upon completion of the Phase II program, a portable Fatigue Damage Assessment instrument usable for martensitic steels, as well as Al and Ti alloys, will be built and delivered

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----