SBIR-STTR Award

Rectangular Concrete Pressurized Room for Hyperbaric Oxygen Medical Treatment
Award last edited on: 5/20/2002

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$95,868
Award Phase
1
Solicitation Topic Code
AF93-023
Principal Investigator
Jack R Maison

Company Information

Engineered Medical Systems Inc

1856 Lockhill Selma Suite 105
San Antonio, TX 78213
   (210) 341-5461
   N/A
   N/A
Location: Single
Congr. District: 20
County: Bexar

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
1993
Phase I Amount
$95,868
HyperBaric Oxygen (HBO) therapy is a proven treatment for numerous medical conditions. HBO therapy is based on the premise that oxygen at pressure greater than atmospheric provides enhanced healing. The major cost component of any HBO treatment center is the structure that contains the elevated pressure. Conventional practice has been to use steel pressure vessel technology for fabrication of HBO chambers. Accordingly, HBO chambers are cylindrical in shape. Medical HBO practitioners want rectanglar rooms instead of cylindrical chambers. Patients are often frightened by the appearance of a large steel cylinder. Rectangular rooms give better space utilization and can be integrated directly into the hospital. The rectangular room cannot be economically constructed using conventional steel pressure vessel practice; but concrete offers an economic alternative. A USAF study showed cost savings potential of 70% using concrete. Commercialization of this technology awaits proof of concept. The objective of this study is to construct and test of a full size rectangular concrete pressure vessel for human occupance (RCPVHO). The Phase I technical objective is to develop a detailed design of a full size prototype RCPVHO. Construction drawings and specifications will be prepared and a testing plan generated.

Keywords:
Concrete Pressure Vessels Rectangular Pressure Vessesls Hbo Pvho Hyperbaric Oxygen

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----