SBIR-STTR Award

Navy Integrated Cost / Benefit Analysis Tool
Award last edited on: 4/11/2014

Sponsored Program
SBIR
Awarding Agency
DOD : Navy
Total Award Amount
$4,599,644
Award Phase
2
Solicitation Topic Code
N01-150
Principal Investigator
Andre J Pruitt

Company Information

The Consulting Network Inc (AKA: TCNI)

209 Washington Street
Middletown, MD 21769
   (301) 765-2183
   N/A
   www.tcni.com
Location: Multiple
Congr. District: 08
County: Frederick

Phase I

Contract Number: N00600-02-C-0302
Start Date: 1/2/2002    Completed: 10/9/2002
Phase I year
2002
Phase I Amount
$99,976
Any Total Ownership Cost (TOC) reduction initiative requires completion of a cost/benefit analysis, including the detailed preparation of a Life Cycle Cost (LCC) analysis. LCC models are often very labor intensive to complete with inputs that are typically derived from various engineering disciplines and/or existing databases. The proposed SBIR development will provide an Internet accessible LCC model for rapid completion of Navy related cost/benefit analyses in a collaborative environment. Application-specific schemas will be developed to link existing Navy and commercial databases for "auto-completion" of LCC model inputs. An Application Programming Interface (API) will also be developed to facilitate interfacing with other Navy applications. The output format of the cost/benefit analysis will use a standard Navy TOC reduction format. An Internet accessible LCC model would provide a collaborative environment for rapid cost/benefit analysis of commercial products. Since model inputs are typically derived from various engineering disciplines and/or existing databases, an Internet accessible LCC model would expedite completion of a cost/benefit analysis by supporting input from diverse locations. Application-specific interfaces would support linking existing commercial databases for "auto-completion" of model inputs. In addition, an Internet accessible LCC model will support rapid revision of an existing cost/benefit analysis based upon updated model inputs.

Keywords:
Cost/Benefit Analysis, Life Cycle Cost Model, Total Ownership Cost Reduction, Application Programming Interface, Internet Accessible, Auto-Comple

Phase II

Contract Number: N00600-03-C-0263
Start Date: 9/30/2004    Completed: 8/29/2006
Phase II year
2003
(last award dollars: 2005)
Phase II Amount
$4,499,668

Any Total Ownership Cost (TOC) reduction initiative requires completion of a cost/benefit analysis, including the detailed preparation of a Life Cycle Cost (LCC) analysis. LCC models are often very labor intensive to complete with inputs that are typically derived from various engineering disciplines and/or existing databases. The proposed SBIR development will provide an Internet accessible LCC model for rapid completion of Navy related cost/benefit analyses in a collaborative environment. Application-specific schemas will be developed to link existing Navy and commercial databases for "auto-completion" of LCC model inputs. An Application Programming Interface (API) will also be developed to facilitate interfacing with other Navy applications. The output format of the cost/benefit analysis will use a standard Navy TOC reduction format. An Internet accessible LCC model would provide a collaborative environment for rapid cost/benefit analysis of commercial products. Since model inputs are typically derived from various engineering disciplines and/or existing databases, an Internet accessible LCC model would expedite completion of a cost/benefit analysis by supporting input from diverse locations. Application-specific interfaces would support linking existing commercial databases for "auto-completion" of model inputs. In addition, an Internet accessible LCC model will support rapid revision of an existing cost/benefit analysis based upon updated model inputs.

Keywords:
Advanced Processing Build, Open Architecture Computing Environments, Obsolescence Avoidance, Portable Software, Cots, Productivity, Logistics, Support