SBIR-STTR Award

Field-Expedient Combat Load Assessment Device (CLAD)
Award last edited on: 2/19/2007

Sponsored Program
SBIR
Awarding Agency
DOD : Army
Total Award Amount
$69,373
Award Phase
1
Solicitation Topic Code
A05-176
Principal Investigator
Forest J Carignan

Company Information

Advanced Mechanical Technology Inc (AKA: AMTI )

176 Waltham Street
Watertown, MA 02472
   (617) 926-6700
   helpdesk@amtimail.com
   www.amti.biz
Location: Single
Congr. District: 05
County: Middlesex

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2006
Phase I Amount
$69,373
Field combat load assessment for combat training and combat mission personnel load management is an identified military need. The combat load assessment device or CLAD must meet several requirements not found in off-the-shelf commercial or consumer weighing devices. Weight requirements, accuracy requirements, functional requirements, and cost requirements prohibit the use of currently OTS hardware. In the subject proposal a low cost, high accuracy field weighing system is proposed. This system is extremely rugged in that all mechanical axes are inherently overload protected. Low cost sensing elements utilizing Hall effect sensor technology provide a robust electromechanical weight sensor. A tri-corner mechanical design ensures stability on uneven surfaces while integrated inclinometers provide automatic correction for incline induced error. The expected wide range thermal environment requires Hall effect sensor compensation via Hall effect gain trimming, magnet thermal compensation, or thermal sensor based signal conditioning. The relative simplicity of the electronic conditioning necessary for Hall effect measurements and simplicity of the mechanical sensing elements render this design likely to succeed from a performance perspective. AMTI's 10-year history as a manufacturer of low-cost medical force measurement and weighing technologies incorporating similar Hall effect technology ensures a high probability of success of this project

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----