SBIR-STTR Award

Evaluation of Airframes with Pulsed Eddy Currents
Award last edited on: 3/6/2002

Sponsored Program
SBIR
Awarding Agency
NASA : LaRC
Total Award Amount
$70,000
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
Walter N Podney

Company Information

SQM Technology Inc

6865 Flanders Drive unit C
San Diego, CA 92121
   N/A
   N/A
   N/A
Location: Single
Congr. District: 52
County: San Diego

Phase I

Contract Number: ----------
Start Date: ----    Completed: ----
Phase I year
2000
Phase I Amount
$70,000
Use of pulsed eddy currents with superconductive probes offers new technology to image fatigue cracks and corrosion hidden in sublayers of thick sections of airframes, such as wing boxes. A superconductive probe uses a superconductive quantum interference device (SQUID) to achieve unmatched sensitivity and resolution of magnetic flux at frequencies below 100 Hz. It enables deep penetration of aluminum structure. Pulsed eddy currents, at repetition rates below 100 Hz, can provide images of fatigue cracks and corrosion hidden deeply in an airframe from a single scan across a fastener diameter. Pulsed currents enable timing a return to identify depth of a defect and to generate an image from multiple returns. They can give images of defects in a cross section of a structure. To realize the promise of superconducting probes operating with pulsed eddy currents, Phase I develops signal processing algorithms to demonstrate feasibility of achieving high resolution images of small defects hidden deeply in multilayered structure.

Potential Commercial Applications:
Successful completion of the proposed research leads to meeting a primary technical need for maintaining structural integrity and continued airworthiness of aging aircraft. Superconductive probes would give reliable images of cracks and corrosion hidden in sublayers of airframes, reducing the need to tear apart a structure for inspection. The probes and methods would find pervasive use in the maintenance of aircraft, offering savings in maintenance costs and enhancing aircraft safety.

Phase II

Contract Number: ----------
Start Date: ----    Completed: ----
Phase II year
----
Phase II Amount
----