SBIR-STTR Award

Integration of Passive Components into Organic MCM Packages
Award last edited on: 4/3/2002

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$99,003
Award Phase
1
Solicitation Topic Code
AF99-047
Principal Investigator
Lutz Brandt

Company Information

Ormet Circuits Inc (AKA: Toranaga Technologies Inc~Ormet Corporation)

??6555 Nancy Ridge Drive
San Diego, CA 92121
   (858) 831-0010
   support@ormetcircuits.net
   www.ormetCircuits.com
Location: Single
Congr. District: 51
County: San Diego

Phase I

Contract Number: F29601-99-C-0084
Start Date: 4/30/1999    Completed: 4/10/2000
Phase I year
1999
Phase I Amount
$99,003
Integrating passive components into substrates is seen by both military and commercial organizations as a key enabling technology for next generation electronics. NEMI (National Electronics Manufacturing Initiative) projects that by 2001, 20% of the total resistors and capacitors needed will be integrated passives. The proposed program will therefore focus on developing widely applicable processes for incorporating passives into organic MCM-type packages. Integrated multilayer substrates will be built in a fully additive process using photodefineable polymeric dielectrics. The photopatterned dielectric will serve to narrowly define the dimensions of the integrated passive components. The approach is versatile in that it can employ a variety of passive and dielectric materials and is compatible with microvia technology. Only equipment that is already well-established in board and assembly houses will be used in order to obviate technology diffusion barriers. Apart from reduction of size, weight, power and cost factors, the development will eventually enable higher speed products, by providing termination and decoupling physically closer to drivers of high-speed signals. The current limit of signal speed using discrete resistors and capacitors is .5 GHz. Phase I will demonstrate feasibility by designing and building an MCM-prototype through cooperation with the Air Force to meet current needs.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----