SBIR-STTR Award

Wave Gun Implementation At The Eglin Afb Aeroballistic Range Facility
Award last edited on: 11/19/2002

Sponsored Program
SBIR
Awarding Agency
DOD : AF
Total Award Amount
$63,602
Award Phase
1
Solicitation Topic Code
AF93-164
Principal Investigator
John H Huntington

Company Information

Huntington Research & Engineering

424 S 16th Street
San Jose, CA 95109
   (408) 293-9425
   N/A
   N/A
Location: Single
Congr. District: 18
County: Santa Clara

Phase I

Contract Number: F08630-93-C-0025
Start Date: 5/7/1993    Completed: 11/6/1993
Phase I year
1993
Phase I Amount
$63,602
The Aeroballistic Range Facility (ARF) at Eglin Air Force Base needs to improve the operational and ballistic characteristics of launchers used in testing aerodynamic configurations in its instrumented range. A high piezometric efficiency is required to reduce acceleration loads exerted on fragile projectiles. It is also desirable to reduce or eliminate shocks in the light gas. A longer barrel also would be beneficial. The launchers are constrained to a total length of approximately 30 ft. The Wave Gun is an ideal candidate for this application in that its inherent characteristics match the ARF requirements. It provides several propulsion pulses to the projectile as it accelerates down the barrel, which significantly increases piezometric efficiency. It employs a short pump tube, allowing for a longer barrel in the confined space available at ARF. The consumables can be incorporated into cartridges, facilitating turnaround. Additional experience with single-shot Wave Gun can lead to improved understanding of its potential for weaponization. A Phase I SBIR program is proposed that will address the specific requirements of ARF, perform interior ballistic calculations with the AIBAL code which was developed and proven for Wave Gun performance analysis, and produce a design optimized for ARF. The potential utility of existing Wave Gun hardware will be evaluated as part of this effort.

Keywords:
WAVE GUN WEAPONIZATION BALLISTIC RANGE FACILITY

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----