SBIR-STTR Award

Research & development of gas cleaner for gasified coal locomotive
Award last edited on: 4/12/2002

Sponsored Program
SBIR
Awarding Agency
DOT
Total Award Amount
$49,830
Award Phase
1
Solicitation Topic Code
-----

Principal Investigator
William Brobeck

Company Information

Brobeck Corporation (AKA: William M Brobeck & Associates)

759 Gilman Street
Berkeley, CA 94710
   (510) 528-5000
   N/A
   N/A
Location: Single
Congr. District: 13
County: Alameda

Phase I

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase I year
1984
Phase I Amount
$49,830
Coal is an attractive fuel for railroad locomotives because of its domestic abundance and low cost per unit of heat. One restraint in coal as a locomotive fuel is environmental pollution. Considering these conflicting conditions of attractiveness and difficulty In using coal as a fuel, it becomes quite important how the coal is handled and converted to heat for locomotive power. A study of heat engines for using coal, leads us to conclude that a gasified coal producer is the best method for using coal. We have examined the major subsystems involved: the gas producer, gas cleaner, controls, waste disposal, engine and the electric drive. The one area needing further research and development is-the gascleaning subsystem. We are proposing to develop the chemistry and handling system necessary to fit a gas-cleaning system on a gasified coal locomotive. A serious effort is required to insure that sulphur in the coal does not end up in the engine exhaust. Once a gas-cleaning system can be demonstrated that controls this pollutant, there is substantial evidence that locomotive manufacturers, railroads and heavy equipment fabricators will become investors and purchasers. This locomotive design has a potential to reduce railroad fuel costs by 60% (more than $2 billion annually) and allow the industry to eliminate its dependence on foreign oil supplies. If the design proves feasible in the preliminary analysis of Phase I and in testing of Phase II, preliminary inquiries indicate the railroad industry would support the remaining development effort.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----