SBIR-STTR Award

Advanced Battery Manufacturing Technologies
Award last edited on: 7/11/2016

Sponsored Program
SBIR
Awarding Agency
DOD : DLA
Total Award Amount
$99,962
Award Phase
1
Solicitation Topic Code
DLA142-001
Principal Investigator
Joseph Turner

Company Information

K2 Energy Solutions Inc (AKA: K2energysolutions)

7461 Eastgate Road
Henderson, NV 89011
   (702) 478-3590
   info@k2battery.com
   www.k2energysolutions.com
Location: Single
Congr. District: 03
County: Clark

Phase I

Contract Number: HQ0147-15-C-8005
Start Date: 8/28/2015    Completed: 8/27/2016
Phase I year
2014
Phase I Amount
$99,962
Xerion Advanced Battery Corp (XABC) proposes Advanced Battery Manufacturing Techniques for High Performance, Low Cost Lithium Ion Batteries. XABC has developed a 3D battery electrode called StructurePore that allows for rapid ion and electron transport, enabling 5 minute charge times at 280Wh/kg on a positive + negative electrode basis. StructurePore batteries utilize a novel manufacturing method, electroplating, which typically is not used in battery manufacturing. Electroplating allows usage of material precursors that are inherently cheaper than refined ceramic powders. These precursors may be cheaper (10-30%) or significantly cheaper (1x-5x) depending on purity. A 53% reduction in raw material cost has been shown to reduce total cost ($/kWh) by 30% at large volume. Furthermore, electroplating reduces process complexity; resulting in decreased reliance on milling and sintering, thus further reducing costs. Due to their ability to handle high power, StructurePore batteries have inherently low internal resistance, which decreases thermal buildup and stress under normal and even extreme conditions. A 3D conductive current collector, built into all StructurePore batteries, helps to dissipate heat without the need for heat sinks or extensive modification. All of this results in a product that is inherently safer than a traditional 2D lithium ion battery.

Phase II

Contract Number: ----------
Start Date: 00/00/00    Completed: 00/00/00
Phase II year
----
Phase II Amount
----